Fitting Out a Light Industrial or Creative Studio Space in the Inner West? What Your Power Supply Actually Needs to Handle
What does your power supply actually need to handle if you are fitting out a light industrial or creative studio space in the Inner West? It comes down to what your equipment actually draws, not just how big the room is. A pottery kiln, a woodworking dust extractor, a screen printing dryer or a small batch fabrication setup can each pull more current at start up than they do running, and the way your switchboard and supply are sized has to account for that properly rather than just adding up nameplate ratings.
1. Why a converted industrial unit is not a blank canvas
The old warehouses, workshops and light industrial buildings scattered through Marrickville, Alexandria and the St Peters fringe were built for a completely different era of tenant, and the existing switchboard and supply were sized for whatever business was in there decades ago, not for a modern ceramics studio, a small print workshop or a fit out gym with heavy equipment. Before signing a lease or committing to a layout, it is worth finding out what supply the building actually has, because retrofitting a bigger connection into an existing industrial strata building can be a genuinely slower and more expensive job than doing the same work in a purpose built commercial unit. Our guide on whether a commercial property needs a larger three phase supply explains how that call gets made, and our power supply upgrades service covers the work itself.
2. How the supply gets sized properly
Under AS/NZS 3000's non-domestic maximum demand method, your submain and switchboard sizing is based on load groups and diversity factors rather than simply adding up the full rated current of every machine, light and powerpoint circuit. In practice this means an electrician works through your actual equipment list, groups it sensibly, and applies the appropriate demand allowance to each group before sizing the incoming supply. A separate floor area based method exists as a quick early estimate for shops and light industrial tenancies before the fitout detail is locked in, which is genuinely useful for a rough budget conversation with your landlord, but it still needs checking against the real equipment list once you have one.
3. Kilns, extraction and the equipment that catches people out
A ceramics or glass kiln draws a steady, predictable load once it is up to temperature, but the initial heat up period and the circuit protection needed for it still has to be sized correctly, and a lot of older buildings simply do not have a circuit rated for it without work. Dust extraction and compressed air equipment common in woodworking and fabrication studios add their own starting current spikes on top of whatever else is running, and screen printing dryers, film processing gear and small batch manufacturing equipment all have the same issue: the steady state rating on the nameplate is not the whole story for how the circuit needs to be protected and sized. If a new machine is already tripping your existing supply, see our guide to new machinery tripping commercial power.
4. What welding and fabrication equipment specifically requires
If your studio or workshop includes any arc or resistance welding equipment, this gets its own demand calculation rather than being lumped in with general power. An individual welding machine is generally assessed at its full rated primary current, and where there is more than one machine, the rules apply a stacking allowance (the two largest machines counted close to full current, with smaller allowances added for additional machines) rather than simply adding every machine's full rating together. This matters for a shared workshop or a studio with more than one tenant running equipment, since it changes what size the supply genuinely needs to be.
5. Safety switches on a commercial or light industrial tenancy
Non-domestic premises have a narrower mandatory safety switch scope than a home does, which is a genuine difference from the residential rules covered in some of our other Inner West posts. This does not mean a workshop or studio is less safe by design. It means the compliance benchmark is different, and an older industrial tenancy that looks bare by residential safety switch standards can still be entirely compliant for its actual use, right up until the day the switchboard is altered or replaced, which then triggers an upgrade under the current rules. Our safety switch installation and switchboard upgrades services cover that work.
6. Single phase, three phase and what actually needs it
Plenty of creative studios run entirely on single phase: photography and film studios, most textile and print workshops, and smaller kilns all fall into this category. Three phase becomes necessary for larger kilns, most serious woodworking machinery, welding equipment above a certain size, and anything with a genuinely large motor. If you are not sure which category your planned equipment falls into, it is worth getting this checked before you lease a specific unit, since moving from single to three phase in an existing strata industrial building can mean upgrading the building's own supply, not just your tenancy's board.
7. Budgeting for the fitout electrical work realistically
The floor area estimate is a fine starting point for an early budget conversation, but the final number depends on your actual equipment list, whether the building already has spare capacity, and whether any of your equipment (kilns, welders, larger extraction systems) needs its own dedicated, properly protected circuit. Getting a proper assessment before signing a lease, rather than after, avoids the situation where the fitout budget blows out because the building's existing supply simply cannot support what the business actually needs.
How Does High Demand Electrical Help With Light Industrial and Studio Fitouts?
We are a licensed local team working across the Inner West's older industrial buildings, not a call centre reading from a script, and we know the practical difference between a floor area estimate and what a studio or workshop's actual equipment list requires. We assess the existing supply and switchboard, work through the demand calculation properly for kilns, extraction, welding and workshop machinery, and tell you honestly before you sign a lease whether the building can support your fitout or whether the landlord needs to be part of that conversation. We service creative and light industrial tenants across Marrickville, Alexandria, St Peters and the surrounding Inner West.
Frequently Asked Questions
Get Your Studio or Workshop Fitout Assessed
Planning a light industrial or creative studio fitout in the Inner West? Get a fitout design and supply assessment quote or call 0402 808 808. Every fitout starts with a site assessment, since the right supply size depends on your building's existing capacity and your actual equipment list, not a generic estimate.
This fitout angle sits alongside our existing look at converting a warehouse or loft into a home (the residential side of the same older industrial buildings), opening a cafe or restaurant in the Inner West (the hospitality fitout side), and our guide to new machinery tripping a commercial supply, which covers what happens when equipment is added to an existing tenancy rather than planned in from the start. For the pole fed side of a light industrial property on a private supply, see HD Power Pole's guide to whether a private power pole can handle three phase.
Related Services
Powering Your Needs with Expertise
If you want a reliable, experienced, and prompt electrician, High Demand Electrical Inner West is the one to call. We cover every electrical need — routine maintenance, emergency repairs, full system installs — and our team is focused on keeping your setup running smoothly. Small task or big project, give us a ring today.


