Does Your Inner West Solar Installation Need Its Own Earthing and Bonding?
Does your Inner West solar installation need its own earthing and bonding? Yes, a rooftop solar array has its own separate earthing and bonding requirements under AS 5033, on top of the equipotential bonding rules that already apply to the rest of your home. Panel frames, mounting rails and the earth conductor running back to your switchboard all have to be sized and connected a specific way, and it is an easy step to miss on an older Inner West terrace being fitted with solar for the first time.
1. Why solar panels need their own earthing rules
AS 5033 sets out several reasons for earthing the exposed conductive parts of a solar array: giving faults and leakage currents somewhere safe to go, lightning protection, equipotential bonding, enabling the inverter's own fault detection and alarm function, and reducing electromagnetic interference. A rooftop array sits in an unusually exposed position compared with most household wiring, fully outdoors, bolted to a metal frame, and often the highest point on the property, so the standard treats it as its own earthing problem rather than folding it into the general household rules.
Once the calculated maximum voltage of the array's DC circuit is above 35 volts, which effectively every modern residential solar system reaches, every conductive panel frame, any array mounting frame in direct contact with the DC cables, and any conductive cable support or wiring enclosure touching those cables must be earthed.
2. What actually needs to be earthed on your roof
The requirement covers the panel frames themselves, the aluminium racking the panels sit on where it touches the DC cabling, and any metal conduit or cable tray carrying those cables. A panel frame mounted in an insulating conduit is treated differently, since that cabling is not considered to be in direct contact, but most residential racking systems do not rely on that exception in practice.
Where the array is connected to what AS 5033 calls a non earth referenced system, such as some independent pumping setups, the exposed conductive parts instead need to be equipotentially bonded together rather than earthed in the conventional sense. Almost every Inner West rooftop solar system connected to the grid is an earth referenced system, so the earthing requirement is the one that applies in the vast majority of real jobs.
3. How the panel frames are actually connected
AS 5033 is specific about how the earthing or bonding connection to a panel frame is made. A purpose made fitting designed for dissimilar metals, a purpose made washer with serrations or teeth that penetrates the surface, or a tinned cable lug fixed with stainless steel bolts and washers are all acceptable methods, each installed according to the manufacturer's instructions. Self tapping screws and rivets are explicitly ruled out for this job.
Every one of these connections also has to be protected against corrosion, which matters on an exposed Inner West rooftop that deals with coastal air, and the whole arrangement has to be set up so that removing any single panel does not break the earthing continuity to the rest of the array. On an older terrace with a mixed metal roof, checking for galvanic compatibility between the racking and the roof material is worth raising with your installer at the same time, since the two issues sit close together in practice even though the standard treats them separately.
4. Sizing the earth conductor correctly
The cross sectional area of the earthing conductor for a solar array is not a single fixed figure. AS 5033 works through a decision chart based on whether the array needs lightning protection earthing, whether it is connected to an earth referenced system, whether the inverter is separated or non separated, and whether there is direct current overcurrent protection in place. The resulting conductor size has to achieve no more than 0.5 ohms resistance between the exposed conductive parts and the main earthing system, with 4 millimetres squared as the absolute minimum conductor size regardless of which path through the chart applies.
In most straightforward residential setups without a dedicated lightning protection requirement, the inverter's own alternating current earth conductor can sometimes be used as the connection point back to the main earthing system, provided it is sized correctly for the system in use. Getting this sizing right is not something to guess at, and it is exactly the kind of detail that should appear on your installer's test results and compliance paperwork rather than being assumed.
5. Where this connects back to your switchboard
However the panel frames are earthed, that conductor ultimately needs to tie back into your property's main earthing system, the same system this equipotential bonding series has already covered for metal pipework and bathroom concrete reinforcing. Our earlier post on equipotential bonding for Inner West terraces explains how that main system works for household pipework, and the same principle carries through to the bathroom concrete floor bonding and pool and spa bonding rules covered elsewhere on this site. A solar installation adds another conductor into the same system rather than replacing it, which is exactly why an ageing or undersized switchboard earth on an older terrace is worth checking before solar goes on the roof, not after.
This is also where a switchboard upgrade often gets raised during a solar quote. An older Inner West switchboard built decades before rooftop solar was common was never designed around an extra earthing conductor, an inverter circuit and the protective devices a modern array needs, so a proper electrical safety inspection before committing to solar is time well spent.
6. Why this comes up so often during an Inner West solar fit out
Inner West terraces have a few things in common that make this worth checking carefully: older subfloors and roof spaces that were never wired with solar in mind, a mix of original and newer metal roofing or guttering nearby, and a renovation history where the switchboard has sometimes been updated without ever being reassessed against a future solar install. None of that makes solar unsuitable for a terrace, but it does mean the earthing and bonding step deserves the same attention as the panels and the inverter themselves, rather than being treated as a formality.
It is also worth asking your installer directly how the panel frame earthing was done and what conductor size was used, the same way you would ask about panel brand or inverter warranty. A compliant installer will have this information ready and will have recorded it as part of the job's test results.
Why Is Solar Earthing Level 2 ASP Work?
The solar array itself is installed by a Clean Energy Council accredited installer working to AS 5033 and AS 4777.2, but the point where that earthing conductor joins your property's main earthing system, and any switchboard work needed to accommodate it safely, sits squarely within general electrical and Level 2 ASP territory. Where an inspection finds the existing switchboard earth undersized, aged or simply not up to taking an extra conductor safely, that is a job for a licensed Level 2 electrician, not something to leave to the solar installer alone. Our Power Pole team has also covered how a property's earthing system changes once demand grows, in a guide to when CT metering gets triggered, which is a useful comparison for anyone adding solar alongside other load growth on a private pole property.
How Does High Demand Electrical Help With Solar Earthing?
High Demand Electrical is a licensed local team, not a call centre, with a Director who is Solar SAA accredited as well as a Level 2 ASP, so we see both sides of a solar fit out rather than just the switchboard end of it. Before solar goes on an Inner West terrace, we check the existing earthing system, the switchboard's condition and its capacity to take the new earthing conductor safely, and flag any upgrade that is genuinely needed rather than assuming the roof is the only part of the job that matters. We service homes and businesses across the Inner West, including Balmain, Leichhardt, Marrickville, Petersham and the surrounding suburbs, where this earthing question comes up on almost every first time solar install.
Frequently Asked Questions
Ready to Get Your Earthing Checked Before Solar Goes On?
👉 Get a Switchboard Upgrade Quote
Call 0402 808 808
Every job like this needs a site assessment before scope or pricing can be confirmed.
Related Services
Powering Your Needs with Expertise
If you want a reliable, experienced, and prompt electrician, High Demand Electrical Inner West is the one to call. We cover every electrical need — routine maintenance, emergency repairs, full system installs — and our team is focused on keeping your setup running smoothly. Small task or big project, give us a ring today.