Workshop running off a tired single-phase board? Tradie ute charging fleet on the way? New build off Bernera Road, or an Endeavour Energy defect on a residential block? Our ASP Level 2 team upgrades both sides of Prestons — the industrial estate and the residential streets — usually in a single visit, with three-phase as standard.
Prestons Switchboard Upgrade
A standard residential switchboard upgrade in Prestons takes 4–8 hours and costs roughly $1,600–$3,600. Three-phase commercial and industrial upgrades on the Bernera Road corridor typically run $3,500–$8,500 depending on board size, metering and EV-fleet load. Prestons (postcode 2170) sits in the Endeavour Energy network area, so any work touching mains, meter or service line legally requires a NSW ASP Level 2 electrician.

















